Monitoring and Validation

Building Performance Engineering employs the technology of the Aircuity Optima Portable Monitoring System, as well as laboratory testing to validate, document and provide support to customers with IAQ concerns.

Focused on the parameters of:Graph

1) Comfort & Ventilation

  • CO2
  • Temperature
  • Relative Humidity
  • CFM Exchange

2) Air Cleanliness

  • Small Particulate
  • Large Particulate
  • TVOCs

3) Building Pollutants

  • CO
  • Ozone
  • Radon

Comfort and Ventilation

Air Cleanliness

Building Pollutants

CO2 (ppm) Temperature   (°F) Relative Humidity (%) **CFM (Outdoor Air PP) PM 10   (µg/m3) PM 2.5   (µg/m3) TVOC (index)   CO (ppm) Radon   (pCi/l) Ozone (ppm)
2nd Floor 527 65 53 83 1 1 4 0 0.1 0
3rd Floor 608 72 49 50 4 3 4 1 0 0
4th Floor 539 69 48 70 3 2 2 0 0 0
5th Floor 562 75 43 55 2 1 7 0 0.1 0
6th Floor 604 75 44 52 3 2 3 0 0 0
Penthouse   Suite 586 80 37 56 3 2 9 0 0.2 0
Typical/Comfort   < 1100 71 – 74 20 – 60 > 15 < 40 < 20 < 10 < 3 < 2 < 0.1
Recommended < 1100 68 – 78 20 – 60 > 15 < 40 < 20 < 35 < 9 < 4 < 0.1

Follow up documentation provides narrative analysis, real time graphing and numerical data to support next step actions.

Building Performance Engineering offers response to your HVAC issues within 24 hour of initial inquiry.

Contact us in:

Rhode Island:

Building Performance Engineering
10 Dorrance Str, Suite 700
Providence RI 02903
Administrative Offices: #401-519-3659

Connecticut:

Building Performance Engineering
P.O. Box 9541
Bolton, CT 06043
Administrative Offices: #860-803-4478
Fax# 860-647-0052

Jonathan VanDine
Technical Engineering Manager
cell# 860-305-1561